121 units, 6 storeys. 4 inch closed-cell SPF, full exterior walls.
Completed October 2025




The envelope decides three things on a Part 3 MURB. Whether you hit your Step Code target. Whether you capture the FortisBC CNC incentive at $2.50 per square foot. And whether your CMHC MLI Select financing earns the full 50 energy points.
Get the air barrier wrong and all three are at risk. On Park Edge Vernon the as-built blower door came in at 0.20 L/s/m² facade, among the best wood-frame MURB results on record in BC.
We get in before the envelope spec is locked. That is the most valuable position on the project.
The same crew, the same foam, the same standard on every one.
Eco seal was absolutely amazing, responding very timely and gave me a great quote for our house we are building. As a newer company in the okanogan I was very impressed by their professionalism and there workmanship, I would 100% recommend this company for anything they offer.
Jacob is an expert at his craft and displays incredible professionalism, I would highly recommend his company to anyone looking for a job done well, on time, and on budget! Definitely using him for my next project.
I cant say enough about Jacob and his crew at EcoSeal. They showed up early and were quick and efficient. They did a great job and for the best quote. Thanks again.
Outstanding experience from start to finish. The team at Ecoseal was professional, punctual, and highly knowledgeable. They provided clear explanations about the process and benefits of spray foam insulation.
Eco seal did a wonderful insulation job and the workers were timely, polite, professional and hardworking. I highly recommend this company for anyone in the area looking to get spray foam done.
Exceptional service from Eco Seal. Their spray foam insulation transformed my home's comfort and energy efficiency. Professional team, outstanding results, highly recommend.
We review the assembly, the air barrier strategy, and where the project lands on Step Code before the spec is locked.
FortisBC CNC eligibility, the Step Code path, and the CMHC MLI Select energy points your project qualifies for.
The assembly goes to your energy modeller in writing, then we seal the building on schedule and never hold up another trade.
We will tell you straight when spray foam is not the right call. A single room of foam in a batt and poly house will not give you the airtightness benefit. The air just finds the next gap. When a smaller job makes more sense we will say so. That is the whole point of the free building assessment.
We work with developers, builders, and architects from pre-construction through completion.